Residential
Homes, apartments and later-living, from the first dig to the keys.
486 projects handed over
Homes, apartments and later-living, from the first dig to the keys.
486 projects handed over
Offices, retail and hotels, from the first dig to the keys.
312 projects handed over
Schools, healthcare and civic, from the first dig to the keys.
172 projects handed overEvery trade on one programme, run by our own site team.
One contract and one price, design included.
Frames erected by our own crews and cranes.
96% of projects handed over on programme.
A 2,400 m², 4-storey office takes about 51 weeks on site and $8.7M all in. Here is how those weeks are spent.

Setting out, excavation, piling, ground beams and the slab.

The steel or concrete frame, floors, stairs and cores.

Roof, facade and glazing: the building made watertight.

Services, fit-out, testing, snagging and the keys.
Builders, engineers and surveyors on one payroll since 1987, so the people who price your building are the people who build it.



+376380 On Our PayrollBuilders, engineers and surveyors
Six ways to build with us, and one team accountable for all of it.
Main contractor from the first dig to the keys.
Read MoreOne contract, one team, one fixed price.
Read MoreOur own erectors and fourteen tower cranes.
Read MorePiling, basements, slabs and frames.
Read MoreFloors, interiors and buildings brought back.
Read MoreProgramme, cost and quality on your side.
Read MoreThe cost per square metre of each build type at each finish level: an open site, two storeys, build only, with preliminaries and contingency included.
| Build Type | Shell & Core | Standard | Premium | Signature |
|---|---|---|---|---|
| $1,604$148.99 / ft² | $2,227$206.93 / ft² | $2,896$269.01 / ft² | $3,675$341.44 / ft² | |
| $1,777$165.10 / ft² | $2,468$229.30 / ft² | $3,209$298.09 / ft² | $4,073$378.35 / ft² | |
| $2,124$197.31 / ft² | $2,950$274.05 / ft² | $3,835$356.26 / ft² | $4,867$452.18 / ft² | |
| $1,907$177.18 / ft² | $2,649$246.08 / ft² | $3,443$319.91 / ft² | $4,371$406.03 / ft² | |
| $997$92.62 / ft² | $1,385$128.63 / ft² | $1,800$167.22 / ft² | $2,285$212.25 / ft² | |
| $2,297$213.42 / ft² | $3,191$296.42 / ft² | $4,148$385.34 / ft² | $5,264$489.09 / ft² | |
| $3,077$285.90 / ft² | $4,274$397.09 / ft² | $5,556$516.21 / ft² | $7,052$655.19 / ft² |
Rates move with the site, the height and the extras: an urban infill site adds 12%, a brownfield site 7%, and every storey above 2 adds 2%. Design & build adds a 6% design fee.
Projects handed over on or before the programme date.
Final accounts within the agreed contract sum.
Of our work comes from clients who came back.
Of site waste kept out of landfill last year.
72% of our work comes from clients we have built for before.
Samuel Mensah and the safety team answer the site emergency line +1 312 555 0190 day and night.
A priced tender within ten working days, or a first cost per m² in two minutes.
An estimator replies within a working day. For a priced tender, the tender form takes your drawings in five steps.



+376380 On Our PayrollBuilders, engineers and surveyors