Our Brief History, Our
Goals & Motivation
A two-man shop on the Allegheny in 1968; three plants, 640 people and 11 grades in stock today.
- 58Years cutting steel
- 99.1%First-pass yield
Common Questions
At once: the quote builder prices a part from its grade, thickness, size, quantity, bends, welds and finish. Send the drawing and an estimator confirms it within one working day.
DXF and DWG for flat parts, STEP for formed parts and assemblies, PDF for anything else. Dimensions in millimetres or inches.
No minimum quantity. Every order line carries a $85 set-up and programming charge, so ten parts cost far less each than one.
Yes: 6% off from 10 parts; 12% off from 50 parts; 18% off from 200 parts; 24% off from 1,000 parts.
Cut parts ship in 2 working days, a day more with bending, three more with welding, plus the finish. Express takes 40% off the days for 25% more.
On our own trucks within 500 miles, by carrier anywhere in the lower 48, or collect from Pittsburgh for nothing.
Yes: we cut against a forecast and hold the parts, then deliver against your call-offs.
Three Bends,
One Bracket
A 360 mm blank of S355J2, 4 mm thick and 200 mm deep: each bend takes 7.4 t on a V32 die. Scroll and the press brake forms it.
- 01Left Flange0°
- 02Side Wall0°
- 03Return Lip0°
- Blank360 mm x 200 mm
- GradeS355J2, Rm 510 MPa
- Force A Bend72 kN (7.4 t)
- Angle Tolerance±0.5°
Six Processes,
One Floor To The Next
Laser Cutting
- Up to 3 mm±0.05 mm
- 3 - 10 mm±0.1 mm
- 10 - 20 mm±0.15 mm
- 20 - 25 mm±0.2 mm
CNC Bending
- Angle±0.5°
- Flange length±0.2 mm
- Longest bend4,000 mm
- Thickest bend20 mm
Welding & Fabrication
- ProcessesMIG / MAG, TIG, robotic
- QualityEN ISO 3834-2
- Execution classEXC3 to EN 1090
- Assembly±1 mm a metre
Coating & Galvanising
- Powder film60 - 80 micron
- Galvanised85 micron, ISO 1461
- Kettle14 x 2 x 3 m
- ColoursAny RAL
CNC Machining
- Milling±0.02 mm
- TappingM3 - M36
- Table3,000 x 1,200 mm
- SurfaceRa 1.6
Assembly & Kitting
- KitsBy part number
- HardwareFitted and torqued
- Inspection100% first article
- PackingPallet or crate
The Floor, The Bays
And The Yard

Have A Project In Mind?
Send Us The Drawing
DXF, STEP or a PDF sketch: an estimator prices it within one working day, or price a flat part yourself now in the quote builder.
Stock Steel And
Safety Gear
Six Industries And
The Parts They Take
The share of our tonnes each one takes, and the projects we have made for it.
Construction & Infrastructure
Base plates, beams, stair stringers, connection plates
Energy & Offshore
Tower flanges, platforms, pipe supports, skids
Material Handling
Racking uprights, conveyor frames, guarding
Machinery & OEM
Machine bases, enclosures, robot cells
Rail & Transport
Underframe brackets, trailer chassis parts
Agriculture
Loader arms, hitch plates, wear parts