Our plants

Plants & Capacity

Three plants, their machines and the shift on the floor right now.

Throughput

Three Plants Against
Their Capacity

What each plant shipped in the last twelve months against what it can make in a year.

86,000tCapacity a year, three plants

Pittsburgh Works

Laser cutting, bending and machining Running
  • 27,400 tShipped, last 12 months
  • 32,000 tCapacity a year
  • 86%Loaded
  • 260People

Cleveland Fabrication

Heavy welding, fabrication and assembly Running
  • 21,800 tShipped, last 12 months
  • 24,000 tCapacity a year
  • 91%Loaded
  • 230People

Gary Coatings

Powder coating and hot-dip galvanising Running
  • 22,600 tShipped, last 12 months
  • 30,000 tCapacity a year
  • 75%Loaded
  • 150People
The red gantry crane over beams at Pittsburgh Works
Since 1968

Pittsburgh Works

Laser cutting, bending and machining · 4100 Foundry Way, Pittsburgh, PA 15201

Running
  • 28,000m²Floor
  • 260People
  • 86%Loaded

Machines

  • Fibre lasers4 x 12 kW, 3000 x 1500 mm beds
  • Press brakes6, up to 320 t x 4 m
  • Machining centres3 CNC, 3000 x 1200 mm
  • Plasma table1, plate to 40 mm

Shifts

  • MondayA 6 am - 2 pm, B 2 pm - 10 pm, C 10 pm - 6 am
  • TuesdayA 6 am - 2 pm, B 2 pm - 10 pm, C 10 pm - 6 am
  • WednesdayA 6 am - 2 pm, B 2 pm - 10 pm, C 10 pm - 6 am
  • ThursdayA 6 am - 2 pm, B 2 pm - 10 pm, C 10 pm - 6 am
  • FridayA 6 am - 2 pm, B 2 pm - 10 pm
  • SaturdayA 6 am - 2 pm
  • SundayClosed
Welding a pipe joint at Cleveland Fabrication
Since 1986

Cleveland Fabrication

Heavy welding, fabrication and assembly · 880 Ironworks Road, Cleveland, OH 44105

Running
  • 34,000m²Floor
  • 230People
  • 91%Loaded

Machines

  • Welding stations22 MIG / MAG, 4 TIG cells
  • Welding robots3 cells, two-station
  • Gantry cranes2 x 40 t
  • Shot blastLine 4 m wide

Shifts

  • MondayDay 6 am - 2:30 pm, Late 2:30 pm - 11 pm
  • TuesdayDay 6 am - 2:30 pm, Late 2:30 pm - 11 pm
  • WednesdayDay 6 am - 2:30 pm, Late 2:30 pm - 11 pm
  • ThursdayDay 6 am - 2:30 pm, Late 2:30 pm - 11 pm
  • FridayDay 6 am - 2:30 pm, Late 2:30 pm - 11 pm
  • SaturdayDay 7 am - 1 pm
  • SundayClosed
The pipework hall at Gary Coatings
Since 2004

Gary Coatings

Powder coating and hot-dip galvanising · 1500 Kettle Street, Gary, IN 46402

Running
  • 22,000m²Floor
  • 150People
  • 75%Loaded

Machines

  • Galvanising kettle14 x 2 x 3 m
  • Powder line6 m conveyor oven
  • Pre-treatmentShot blast and degrease
  • Daily coatedUp to 110 t

Shifts

  • MondayA 6 am - 6 pm, B 6 pm - 6 am
  • TuesdayA 6 am - 6 pm, B 6 pm - 6 am
  • WednesdayA 6 am - 6 pm, B 6 pm - 6 am
  • ThursdayA 6 am - 6 pm, B 6 pm - 6 am
  • FridayA 6 am - 6 pm, B 6 pm - 6 am
  • SaturdayA 6 am - 6 pm, B 6 pm - 6 am
  • SundayA 6 am - 6 pm, B 6 pm - 6 am
Our output

Tonnes Shipped,
Month By Month

Pittsburgh WorksCleveland Fabrication

Visit A Plant

Audits, first-article reviews and supplier visits: book a tour with the plant manager.

  • ToursMonday to Friday
  • Safety gearProvided at the gate
  • NoticeTwo working days
Book A Visit