Office open Monday to Saturday from 7:30 am 418 West Fulton Street, Chicago, IL 60661 +1 312 555 0147 example@example.com
Estimates & tenders

Know The CostBefore The Dig

A first cost per m² in two minutes, a priced tender in 10 working days and a fixed contract sum.

Design & build

One Contract,One Price

We take on the design team and the design risk, so the price you sign is the price you pay.

Since 1987

Priced By ThePeople Who Build

Our estimators work beside our site managers, so every rate comes from a building we put up.

0103

Ways To Work With Us

Our Services

New build, design and build, frames, groundworks and fit-out.

Two engineers inspecting a gear wheel

Request A Tender

Five steps, your drawings, a priced reply in 10 working days.

A hand in a work glove holding a yellow hard hat
A steel fixer tying a rebar cage

692 Days Safe

Without a lost-time injury, across every site we run.

Two ironworkers bolting a steel beam Built On Programme
Steel rails stacked in a yard

Rates Per m²

Every build type by finish level, all in.

Plant & Tool Hire

From $18 a day, delivered to site the next morning.

The Depot
What will it cost?

The Area Sets The Price

Scroll and the floor area grows: every build type is priced again at that size, all in, at a standard finish on an open site.

100m²
1,076 ft² · 2 storeys
Open The Estimator
  • Houses$2,227 per m² · 13 weeks $223K
  • Apartments$2,468 per m² · 13 weeks $247K
  • Offices$2,950 per m² · 13 weeks $295K
  • Retail & Hospitality$2,649 per m² · 13 weeks $265K
  • Warehouses & Industrial$1,385 per m² · 12 weeks $138K
  • Schools & Public$3,191 per m² · 13 weeks $319K
  • Healthcare$4,274 per m² · 14 weeks $427K
Talk to an estimator

Call +1 312 555 0147

Our estimators answer from 7:30 am; the site emergency line +1 312 555 0190 answers day and night.

Office open Monday to Saturday from 7:30 am

A Client On Structa

Two yellow hard hats

"They handed the campus over a week early, on the number we signed."

Helen Marsh Northgate Estates
Rebar cages for a tunnel arch
The tender

Five Steps To A Price

Start Your Tender
  1. 01

    The Project

    Sector, size, storeys and the site.

  2. 02

    The Scope

    The trades you need and the route.

  3. 03

    Programme & Budget

    Your start date and a budget range.

  4. 04

    Documents

    Drawings at any stage and your details.

  5. 05

    Review

    Check it, send it, get a reference.

The depot

Plant & Tool Hire

Most HiredScissor Lift 8 m
Access Equipment

Scissor Lift 8 m

$120 / day $360 / week