Our services

New Build Construction

Main contractor from the first dig to the keys.

Two ironworkers bolting a beam against the sky
Main contractor

From The First Dig To The Keys

As main contractor we hold every trade, the programme, the site and the safety of everyone on it, under one contract sum.

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore.

The Four Phases Of A New Build

A 2,400 m², 4-storey office takes about 51 weeks; this is where they go.

Foundation

Setting out, excavation, piling, ground beams and the slab.

Weeks 1 to 9 · $1.2M

Frame

The steel or concrete frame, floors, stairs and cores.

Weeks 10 to 26 · $2.7M

Envelope

Roof, facade and glazing: the building made watertight.

Weeks 27 to 38 · $2.4M

Handover

Services, fit-out, testing, snagging and the keys.

Weeks 39 to 51 · $2.4M

What The Contract Covers

  • Site set-up, welfare, hoarding and securityPreliminaries, 12%
  • Every trade, from groundworks to fit-outOur own or vetted
  • A risk allowance held for youContingency, 7.5%
  • Defects after handoverTwelve months

Questions About New Builds

It works from our current rates per square metre for each build type and finish level, plus preliminaries (12%) and contingency (7.5%). Treat it as a first figure within about 8% either way; a tender prices your drawings.